Wednesday, April 21, 2010

First vegetables planted!


I planted my first vegetables in my new planter box. I don't want to go full tilt as there may be one more big snow for the season. I just planted tomatoes, basil, cilantro, red lettuce, green lettuce, and blueberries. I also want to plant some Concord grapes but want to do that in a more permanent (aka real ground) location. I know it may seem strange - Concord grapes in Denver - but at the house I used to live, we had a garden and the Concord grape 'tree' was amazing and produced huge quantities of delicious grapes.

Front door archway started


Now that the front of the house is ready for stucco, I need to construct the front door archway as well as the archway for the double-doors-to-be. I cut out two pieces of plywood and I spaced them apart using Home Depot buckets lol. Seemed about the width I wanted. The arch I will construct is called an Islamic arch or Moroccan arch. I'll brace the pieces together, prep the sides and faces for stucco and then fix it at the front door.


I'll just repeat the sequence for the double-doors albeit on a larger scale.

Tuesday, April 20, 2010

Spa pump blockage


When I first fired up the hot tub, the pressure was really low but the pump seemed to be fine and everything else was in working order. I had relegated myself to either buying a new/refurbished pump or paying someone to fix it. I took the pump out this past weekend and lo and behold, look what I saw.


This looks a bit like sabotage as there is no way those huge pieces of plastic (from what?) could make it through the filter and through all the twists and turns of the piping.

Either way, it's working fine now!

Planter box ready for dirt


The planter box by the front door is ready for dirt. It's about 3' X 8' X 2.5' (height). It will have veggies shortly. The pipes (yes, with socks over the holes) go down into a sort of french-drain which drains water away from the front door area.

Tuesday, March 30, 2010

First section of bamboo fencing added


My plan all along was to have bamboo fencing facing the inside like in the following picture. I've only put in one section to see how it looked prior to taking the plunge for the rest of the fence. I encountered a few problems such as the brown (or 'espresso') boards at the top and bottom of the bamboo are a bit warped and it will be tough to keep any similar boards from warping. Even the cedar 2X6 (8ft) at the top (not pictured) was a bit warped, which is rare for cedar.


I'll let this sit for a few days before making up my mind. I know I want bamboo in a 'picture box' style fence set up but the size and position of the brown border boards will likely change.

Hot tub electrical installed




The last major contractor work was completed this morning. This means everything else I want to do can be done by yours truly. This morning's work consisted of adding a 50A circuit for the hot tub connection (including running the beefy and expensive 6 gauge electrical cable from the box all the way through an interior wall, most of the floor, through the wall to the outside and all the way to the hot tub), while also adding two new 20A circuits: 1 for the kitchen island and one for outside, installing the outside 20A electrical junction box, and installing the outside 50A hot tub GF breaker box.

Tonka time




I was able to procure an excavation tractor through Hammer, a neighbor of mine who is a lifelong contractor (that's him in the baseball hat directing Tonka traffic in my front yard).


I had a strip of asphalt and concrete removed from the area where my future walkway will be. Then the tractor graded that same section to make it below the level of the front door (the problem spot).




The reason for this being that the age of the house and build up over those 116 years makes the surrounding land 4-6 inches higher than the floor of the house.