
The main room is going to become my new kitchen and a good portion of my energy has been spent thinking about how I'm going to lay everything out. I've begun cutting into the floor so I can lay in drain pipe, water pipes, a gas line, and some electrical. I've also spray painted the floor where I plan to place the appliances, the counters, the dining island, and a small dining booth in the corner.
I'll lay out and and connect as much as I can and then have a plumber come and perform a 'real' hookup so it's done right as I don't want to have to tear up the soon-to-be-hardwood-and-cement-floor to fix a gas and or water leak.
