Sunday, December 6, 2009

Saturday, December 5, 2009

Bathroom painting finished... now just cleanup



I finally finished the bathroom painting and all that remains is to clean up, remove masking, put the shower hardware on, and silicon where the tub meets the slate.

Monday, November 30, 2009

Wall Sculpture coloring


Here's the latest wall sculpture picture showing the coloring I'm slowly adding to the structure. When I sand it, the color gets exposed. I sandwich layers of color between layers of plaster.

WTF?


After discovering that the door frame material was not part of the load-bearing structure, I began to dismantle the old framing to replace it rather than spend hours sanding down the myriad layers of paint... and I found this wonder...

I think it is/was an old napkin or dish rag.

"Hmm... I need to put something in that there hole but damn if I can't find something functional, like some of dat there fancy-smancy insul-shun stuff... hey, looky thar, Ima gonna just put that there dish rag in that thar hole."

Remodel Hazards...


I guess black widows are in CO as well...

Bathroom painting coming along...



Here are a few pics showing the current state of the bathroom walls...

Friday, November 27, 2009

Wall Sculpture Progress



I made significant progress on the wall sculpture today.

Tuesday, November 24, 2009

Wall Sculpture Started

As I've delayed my move-in date, I've decide to take on a few ambitious tasks that could only reasonably be accomplished while not living in the house. This wall sculpture, for lack of a better term, is a free-form-organic shape on the wall to both cover up the vestigial fireplace vent masonry as well as add to an otherwise boring-rectangle room.

Here is some of the initial plaster-wiring over the old masonry.



I'm using chicken wire stapled into the wall and then covering with burlap+plaster and then sculpturing the plaster.






Here is a close-up of the burlap-over-wiring.

Saturday, October 31, 2009

Bathroom painting started

I started painting the bathroom now that the shower is complete. I'll be covering the walls with a mix of paint, stucco, gravel, and sand. I'll be rounding out any 90 degree angles (both walls and ceiling). I'm also going to add some frieze-type artwork to the walls.

Saturday, September 12, 2009

Shower Slate Tile Grout is cured

The Grout for the shower slate tiles is cured and I put the first coat of sealant on it.

Saturday, August 29, 2009

Locks re-keyed

The locksmith was over today and had to pick the rear door lock (no keys for that one) and then re-key the remaining locks (6 total) so now I have just one key.

Thursday, August 27, 2009

Thinset still not cured....

The thinset behind the slate tiles was still not cured as of 2 nights ago... It's the pre-mixed type so it requires the water to evaporate vs. the dry-mixed type that chemically cures. I used the dry-mix for the lower rows as that is stronger.

Sunday, August 23, 2009


Here is the shower with just about all the slate tiles placed. I'll let this cure for a few days and then grout it. After grouting, I'll seal the slate and grout and then put the shower fixtures back on and the shower will be done. Later on, I'll either re-paint or surface the walls with a reddish clay.

Here is the bathroom after putting in new cement backer board and then sealing the seams and edges with sealer tape and thinset.

After ripping out the remaining plastic shower walls, I found this lovely surprise: either there was an old door here that Bob the Builder didn't feel like moving or he just used an old door lying around for a wall... either way, it's just plain wrong.

Here is my main work area where I cut, measure, etc...


There is a strange protrusion in the south wall of the living room that I had to investigate. By investigate I mean drilling, hammer, prybar-ing, etc... I found some lovely wall paper, several layers in fact. I also found these two old stove pipe holes - one for air intake, the other for exhaust.

The shower piping had two leaks: one split from when water froze in the pipe, and another from a joint coming apart. We had to rip out the plastic shower wall and the backer board to get at the pipes. The plumber made short work of fixing the leaks.

Saturday, August 1, 2009

Front Entrance

Yes, the front entrance needs serious help, and by help I mean a nice, thorough sledge-hammering. There is a beautiful, albeit hidden, brick doorway inside this slanted, nylon-siding horror.

And the utility box aka doghouse next to the door will need some, um, adjusting as well.
This is the first post of many, to chronicle the saga of the 817 Mariposa remodel. Casa Mariposa was taken so I chose the tepid 817 Mariposa in it's stead.