Wednesday, April 21, 2010

First vegetables planted!


I planted my first vegetables in my new planter box. I don't want to go full tilt as there may be one more big snow for the season. I just planted tomatoes, basil, cilantro, red lettuce, green lettuce, and blueberries. I also want to plant some Concord grapes but want to do that in a more permanent (aka real ground) location. I know it may seem strange - Concord grapes in Denver - but at the house I used to live, we had a garden and the Concord grape 'tree' was amazing and produced huge quantities of delicious grapes.

Front door archway started


Now that the front of the house is ready for stucco, I need to construct the front door archway as well as the archway for the double-doors-to-be. I cut out two pieces of plywood and I spaced them apart using Home Depot buckets lol. Seemed about the width I wanted. The arch I will construct is called an Islamic arch or Moroccan arch. I'll brace the pieces together, prep the sides and faces for stucco and then fix it at the front door.


I'll just repeat the sequence for the double-doors albeit on a larger scale.

Tuesday, April 20, 2010

Spa pump blockage


When I first fired up the hot tub, the pressure was really low but the pump seemed to be fine and everything else was in working order. I had relegated myself to either buying a new/refurbished pump or paying someone to fix it. I took the pump out this past weekend and lo and behold, look what I saw.


This looks a bit like sabotage as there is no way those huge pieces of plastic (from what?) could make it through the filter and through all the twists and turns of the piping.

Either way, it's working fine now!

Planter box ready for dirt


The planter box by the front door is ready for dirt. It's about 3' X 8' X 2.5' (height). It will have veggies shortly. The pipes (yes, with socks over the holes) go down into a sort of french-drain which drains water away from the front door area.

Tuesday, March 30, 2010

First section of bamboo fencing added


My plan all along was to have bamboo fencing facing the inside like in the following picture. I've only put in one section to see how it looked prior to taking the plunge for the rest of the fence. I encountered a few problems such as the brown (or 'espresso') boards at the top and bottom of the bamboo are a bit warped and it will be tough to keep any similar boards from warping. Even the cedar 2X6 (8ft) at the top (not pictured) was a bit warped, which is rare for cedar.


I'll let this sit for a few days before making up my mind. I know I want bamboo in a 'picture box' style fence set up but the size and position of the brown border boards will likely change.

Hot tub electrical installed




The last major contractor work was completed this morning. This means everything else I want to do can be done by yours truly. This morning's work consisted of adding a 50A circuit for the hot tub connection (including running the beefy and expensive 6 gauge electrical cable from the box all the way through an interior wall, most of the floor, through the wall to the outside and all the way to the hot tub), while also adding two new 20A circuits: 1 for the kitchen island and one for outside, installing the outside 20A electrical junction box, and installing the outside 50A hot tub GF breaker box.

Tonka time




I was able to procure an excavation tractor through Hammer, a neighbor of mine who is a lifelong contractor (that's him in the baseball hat directing Tonka traffic in my front yard).


I had a strip of asphalt and concrete removed from the area where my future walkway will be. Then the tractor graded that same section to make it below the level of the front door (the problem spot).




The reason for this being that the age of the house and build up over those 116 years makes the surrounding land 4-6 inches higher than the floor of the house.

Saturday, March 27, 2010

Digging out the walkway



As the house is so old, the exterior door is actually 4 or 5 inches below the yard level. There was a cement walkway that was 5 inches above the bottom of the door so one had to step down when entering. In fact, the entire structure, is in some way embedded into the ground 4-8 inches which is actually great for keeping the house cool in the summer and warm in the winter.

The doorway I'm talking about enters into, for lack of a better word, a small mudroom that in turn opens up into the actual house. I wanted to level out the entrance way and replace the concrete with what is known as 'Breeze', a sort of gravel and rock mix that packs well into a hard walkway.

In the pictures you can see the dirt hole where the concrete slab (walkway) used to be as well as the broken up asphalt. You can also see the 4.5 ton pile of the breeze waiting to be shoveled into the path when the dirt has been leveled out.

Front wall being prepped for stucco




I've started the process of prepping the front exterior wall for stucco. I removed the nylon siding a few weeks ago to expose the old and tired brick.





Today I adhered 3/4 inch insulation foam onto the face of the wall. Tomorrow I will adhere another 1 inch layer of insulation foam and then cover certain portions with a metal lathe. Then, I'll get a hold of some stucco and get to work!

Sunday, March 14, 2010

Sink cabinet positioned


Positioning the sink cabinet so the water lines, drain pipe, and electrical cable come through the bottom correctly is a major step as all the other kitchen elements position themselves around this fixed location.

The counter seen is just a 3/4 inch piece of 'nice' plywood which will serve as the counter surface so I can test out the shape and size to find out what works prior to building a concrete countertop as seen in the following picture:

Gas line(s) are in



I hired a plumber to put in the gas lines using flexible gas line. I split it off to pipe gas to the cooktop location as well as outside the house for a future outdoor BBQ.

Tuesday, March 9, 2010

Drain and water are in


The new 3" drain is in along with hot and cold water copper lines for the sink and dishwasher. I've also stubbed out a line to the outside for an external water faucet along with a fitting for an irrigation system for the soon-to-be garden!

The most difficult (and stressful) part was cutting a section out of the the somewhat old 3" metal/lead drain pipe so I could fit a new 3" 'T' onto the 2 openings with the 3rd opening of the T receiving the drain line from the sink area.

Saturday, February 27, 2010

Main Room becoming Kitchen


The main room is going to become my new kitchen and a good portion of my energy has been spent thinking about how I'm going to lay everything out. I've begun cutting into the floor so I can lay in drain pipe, water pipes, a gas line, and some electrical. I've also spray painted the floor where I plan to place the appliances, the counters, the dining island, and a small dining booth in the corner.

I'll lay out and and connect as much as I can and then have a plumber come and perform a 'real' hookup so it's done right as I don't want to have to tear up the soon-to-be-hardwood-and-cement-floor to fix a gas and or water leak.

'New' bedroom window


The window piece is new but there was always a window space there but the previous owner had decided, for some strange reason, to paint both sides of the glass and 'hide' it on the inside. There was a shallow (aka useless) bookcase there but as I seem to have misplaced my miniature porcelain cherub collection, I opted to re-institute the window concept so now I have two east facing windows and one west facing.

Granted, it's a rough-in so I still need to patch up the edges and plaster it over but that shouldn't take too long.

Saturday, February 13, 2010

Fence is taking shape



I'm having a 6 ft. cedar fence (standard size and materials) built around the exposed portions of my entire property (about 146 linear feet). I'm putting in 10 ft posts so 8 ft extends above ground so I can 'expand' the fence to 8 feet in certain places. I had 3 or 4 tree stumps removed during the process and paid some of my neighbors to remove the chain link fence rather than pay extra to the fence contractor.

Sunday, December 6, 2009

Saturday, December 5, 2009

Bathroom painting finished... now just cleanup



I finally finished the bathroom painting and all that remains is to clean up, remove masking, put the shower hardware on, and silicon where the tub meets the slate.

Monday, November 30, 2009

Wall Sculpture coloring


Here's the latest wall sculpture picture showing the coloring I'm slowly adding to the structure. When I sand it, the color gets exposed. I sandwich layers of color between layers of plaster.

WTF?


After discovering that the door frame material was not part of the load-bearing structure, I began to dismantle the old framing to replace it rather than spend hours sanding down the myriad layers of paint... and I found this wonder...

I think it is/was an old napkin or dish rag.

"Hmm... I need to put something in that there hole but damn if I can't find something functional, like some of dat there fancy-smancy insul-shun stuff... hey, looky thar, Ima gonna just put that there dish rag in that thar hole."

Remodel Hazards...


I guess black widows are in CO as well...