Monday, November 30, 2009

WTF?


After discovering that the door frame material was not part of the load-bearing structure, I began to dismantle the old framing to replace it rather than spend hours sanding down the myriad layers of paint... and I found this wonder...

I think it is/was an old napkin or dish rag.

"Hmm... I need to put something in that there hole but damn if I can't find something functional, like some of dat there fancy-smancy insul-shun stuff... hey, looky thar, Ima gonna just put that there dish rag in that thar hole."

Remodel Hazards...


I guess black widows are in CO as well...

Bathroom painting coming along...



Here are a few pics showing the current state of the bathroom walls...

Friday, November 27, 2009

Wall Sculpture Progress



I made significant progress on the wall sculpture today.

Tuesday, November 24, 2009

Wall Sculpture Started

As I've delayed my move-in date, I've decide to take on a few ambitious tasks that could only reasonably be accomplished while not living in the house. This wall sculpture, for lack of a better term, is a free-form-organic shape on the wall to both cover up the vestigial fireplace vent masonry as well as add to an otherwise boring-rectangle room.

Here is some of the initial plaster-wiring over the old masonry.



I'm using chicken wire stapled into the wall and then covering with burlap+plaster and then sculpturing the plaster.






Here is a close-up of the burlap-over-wiring.

Saturday, October 31, 2009

Bathroom painting started

I started painting the bathroom now that the shower is complete. I'll be covering the walls with a mix of paint, stucco, gravel, and sand. I'll be rounding out any 90 degree angles (both walls and ceiling). I'm also going to add some frieze-type artwork to the walls.

Saturday, September 12, 2009

Shower Slate Tile Grout is cured

The Grout for the shower slate tiles is cured and I put the first coat of sealant on it.