Saturday, March 27, 2010

Front wall being prepped for stucco




I've started the process of prepping the front exterior wall for stucco. I removed the nylon siding a few weeks ago to expose the old and tired brick.





Today I adhered 3/4 inch insulation foam onto the face of the wall. Tomorrow I will adhere another 1 inch layer of insulation foam and then cover certain portions with a metal lathe. Then, I'll get a hold of some stucco and get to work!

Sunday, March 14, 2010

Sink cabinet positioned


Positioning the sink cabinet so the water lines, drain pipe, and electrical cable come through the bottom correctly is a major step as all the other kitchen elements position themselves around this fixed location.

The counter seen is just a 3/4 inch piece of 'nice' plywood which will serve as the counter surface so I can test out the shape and size to find out what works prior to building a concrete countertop as seen in the following picture:

Gas line(s) are in



I hired a plumber to put in the gas lines using flexible gas line. I split it off to pipe gas to the cooktop location as well as outside the house for a future outdoor BBQ.

Tuesday, March 9, 2010

Drain and water are in


The new 3" drain is in along with hot and cold water copper lines for the sink and dishwasher. I've also stubbed out a line to the outside for an external water faucet along with a fitting for an irrigation system for the soon-to-be garden!

The most difficult (and stressful) part was cutting a section out of the the somewhat old 3" metal/lead drain pipe so I could fit a new 3" 'T' onto the 2 openings with the 3rd opening of the T receiving the drain line from the sink area.

Saturday, February 27, 2010

Main Room becoming Kitchen


The main room is going to become my new kitchen and a good portion of my energy has been spent thinking about how I'm going to lay everything out. I've begun cutting into the floor so I can lay in drain pipe, water pipes, a gas line, and some electrical. I've also spray painted the floor where I plan to place the appliances, the counters, the dining island, and a small dining booth in the corner.

I'll lay out and and connect as much as I can and then have a plumber come and perform a 'real' hookup so it's done right as I don't want to have to tear up the soon-to-be-hardwood-and-cement-floor to fix a gas and or water leak.

'New' bedroom window


The window piece is new but there was always a window space there but the previous owner had decided, for some strange reason, to paint both sides of the glass and 'hide' it on the inside. There was a shallow (aka useless) bookcase there but as I seem to have misplaced my miniature porcelain cherub collection, I opted to re-institute the window concept so now I have two east facing windows and one west facing.

Granted, it's a rough-in so I still need to patch up the edges and plaster it over but that shouldn't take too long.

Saturday, February 13, 2010

Fence is taking shape



I'm having a 6 ft. cedar fence (standard size and materials) built around the exposed portions of my entire property (about 146 linear feet). I'm putting in 10 ft posts so 8 ft extends above ground so I can 'expand' the fence to 8 feet in certain places. I had 3 or 4 tree stumps removed during the process and paid some of my neighbors to remove the chain link fence rather than pay extra to the fence contractor.