Saturday, August 29, 2009
Locks re-keyed
The locksmith was over today and had to pick the rear door lock (no keys for that one) and then re-key the remaining locks (6 total) so now I have just one key.
Thursday, August 27, 2009
Thinset still not cured....
The thinset behind the slate tiles was still not cured as of 2 nights ago... It's the pre-mixed type so it requires the water to evaporate vs. the dry-mixed type that chemically cures. I used the dry-mix for the lower rows as that is stronger.
Sunday, August 23, 2009

Here is the shower with just about all the slate tiles placed. I'll let this cure for a few days and then grout it. After grouting, I'll seal the slate and grout and then put the shower fixtures back on and the shower will be done. Later on, I'll either re-paint or surface the walls with a reddish clay.