Saturday, August 29, 2009

Locks re-keyed

The locksmith was over today and had to pick the rear door lock (no keys for that one) and then re-key the remaining locks (6 total) so now I have just one key.

Thursday, August 27, 2009

Thinset still not cured....

The thinset behind the slate tiles was still not cured as of 2 nights ago... It's the pre-mixed type so it requires the water to evaporate vs. the dry-mixed type that chemically cures. I used the dry-mix for the lower rows as that is stronger.

Sunday, August 23, 2009


Here is the shower with just about all the slate tiles placed. I'll let this cure for a few days and then grout it. After grouting, I'll seal the slate and grout and then put the shower fixtures back on and the shower will be done. Later on, I'll either re-paint or surface the walls with a reddish clay.

Here is the bathroom after putting in new cement backer board and then sealing the seams and edges with sealer tape and thinset.

After ripping out the remaining plastic shower walls, I found this lovely surprise: either there was an old door here that Bob the Builder didn't feel like moving or he just used an old door lying around for a wall... either way, it's just plain wrong.

Here is my main work area where I cut, measure, etc...


There is a strange protrusion in the south wall of the living room that I had to investigate. By investigate I mean drilling, hammer, prybar-ing, etc... I found some lovely wall paper, several layers in fact. I also found these two old stove pipe holes - one for air intake, the other for exhaust.