First section of bamboo fencing added


My plan all along was to have bamboo fencing facing the inside like in the following picture. I've only put in one section to see how it looked prior to taking the plunge for the rest of the fence. I encountered a few problems such as the brown (or 'espresso') boards at the top and bottom of the bamboo are a bit warped and it will be tough to keep any similar boards from warping. Even the cedar 2X6 (8ft) at the top (not pictured) was a bit warped, which is rare for cedar.


I'll let this sit for a few days before making up my mind. I know I want bamboo in a 'picture box' style fence set up but the size and position of the brown border boards will likely change.

Hot tub electrical installed




The last major contractor work was completed this morning. This means everything else I want to do can be done by yours truly. This morning's work consisted of adding a 50A circuit for the hot tub connection (including running the beefy and expensive 6 gauge electrical cable from the box all the way through an interior wall, most of the floor, through the wall to the outside and all the way to the hot tub), while also adding two new 20A circuits: 1 for the kitchen island and one for outside, installing the outside 20A electrical junction box, and installing the outside 50A hot tub GF breaker box.

Tonka time




I was able to procure an excavation tractor through Hammer, a neighbor of mine who is a lifelong contractor (that's him in the baseball hat directing Tonka traffic in my front yard).


I had a strip of asphalt and concrete removed from the area where my future walkway will be. Then the tractor graded that same section to make it below the level of the front door (the problem spot).




The reason for this being that the age of the house and build up over those 116 years makes the surrounding land 4-6 inches higher than the floor of the house.

Saturday, March 27, 2010

Digging out the walkway



As the house is so old, the exterior door is actually 4 or 5 inches below the yard level. There was a cement walkway that was 5 inches above the bottom of the door so one had to step down when entering. In fact, the entire structure, is in some way embedded into the ground 4-8 inches which is actually great for keeping the house cool in the summer and warm in the winter.

The doorway I'm talking about enters into, for lack of a better word, a small mudroom that in turn opens up into the actual house. I wanted to level out the entrance way and replace the concrete with what is known as 'Breeze', a sort of gravel and rock mix that packs well into a hard walkway.

In the pictures you can see the dirt hole where the concrete slab (walkway) used to be as well as the broken up asphalt. You can also see the 4.5 ton pile of the breeze waiting to be shoveled into the path when the dirt has been leveled out.

Front wall being prepped for stucco




I've started the process of prepping the front exterior wall for stucco. I removed the nylon siding a few weeks ago to expose the old and tired brick.





Today I adhered 3/4 inch insulation foam onto the face of the wall. Tomorrow I will adhere another 1 inch layer of insulation foam and then cover certain portions with a metal lathe. Then, I'll get a hold of some stucco and get to work!

Sunday, March 14, 2010

Sink cabinet positioned


Positioning the sink cabinet so the water lines, drain pipe, and electrical cable come through the bottom correctly is a major step as all the other kitchen elements position themselves around this fixed location.

The counter seen is just a 3/4 inch piece of 'nice' plywood which will serve as the counter surface so I can test out the shape and size to find out what works prior to building a concrete countertop as seen in the following picture:

Gas line(s) are in



I hired a plumber to put in the gas lines using flexible gas line. I split it off to pipe gas to the cooktop location as well as outside the house for a future outdoor BBQ.